Inicio/Productos/Cubierta de cemento/Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
80㎡
MOQ
Inquire anytime
Precio
CaracteristicasGaleríaDescripción de productoPida una cita
Caracteristicas
Especificaciones
Material:Fibras textiles y cemento en polvo
ancho:4m
Longitud:20m-50m
Resaltar:
cement blanket for slope protection
,
anti-erosion cement blanket
,
hillside protection cement blanket
Información básica
Lugar de origen:Porcelana
Nombre de la marca:JIANYI
Certificación:ISO9001
Pago y Envío Términos
Detalles de empaquetado:Envases exteriores impermeables y resistentes al polvo
Tiempo de entrega:5-8 días laborables
Condiciones de pago:T/T
Capacidad de la fuente:600t/mes
Galería
Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Descripción de producto
Cement Blanket for Slope Protection
Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Product Overview
Our Cement Blanket is a flexible, easy-to-deploy slope protection material constructed from high-tensile fiberglass mesh and premium Portland cement. The unique structural design ensures excellent adhesion to slope surfaces, forming a dense, crack-resistant protective layer with high compressive and tensile strength after hydration.
Key Advantages:
Lightweight in dry state for easy transport to remote locations
No heavy construction machinery required for installation
Superior erosion resistance and structural stability
Flexible application on various slope configurations
Application Scenarios
Ideal for comprehensive slope protection projects including highway and railway embankments, mountain slopes, riverbank revetments, and mine dump slopes. Effectively prevents soil erosion from rainwater scouring and landslides caused by soil loosening.
Technical Specifications
Details
Maximum Slope Angle
Up to 60 degrees
Application Areas
Rural and urban environments
Environmental Integration
Can be covered with soil for vegetation growth
Construction Process
Slope Preparation: Trim slope to remove weeds, tree roots, and loose soil; level uneven areas and compact the surface thoroughly.
Blanket Laying: Unroll cement blanket from top to bottom of slope, ensuring tight fit; overlap adjacent sheets by 12-18cm and secure with U-shaped nails (spacing: 50-80cm).
Watering & Curing: Spray water gently and evenly until blanket is fully soaked; cover with plastic film in strong sunlight or rain conditions. Initial hardening: 3-5 days. Full strength: 7-10 days.